Calhoun County · about 65 minutes from the shop
Newer growth beside Anniston, and the level ground to use it.
Oxford runs along the I-20 corridor on comparatively level valley ground, with newer residential building spreading across what was farmland. Level and open, but the soil under a new subdivision here has been graded, driven on and skimmed back over rather than left alone.
Level ground and new construction means the soil is the problem rather than the grade: compacted subsoil under thin fill, which has to be opened up before turf or planting will do anything. Hardscape sets easily on it once it is prepared properly.
Newer subdivisions and suburban homes on open lots, where the whole back yard is usually still a blank sheet.
Every trade is available across the whole service area. These are the ones that tend to carry a Oxford project:
All ten trades run in-house, so one crew and one schedule covers the whole job.
The featured jobs are documented before and after, from the same camera position. They are the honest version of what a finished project looks like.
Featured jobsA site visit, a real plan, and a price with the quantities shown. No allowances hiding a guess.