Bartow County · about 35 minutes from the shop
I-75 growth on scraped subdivision ground.
New subdivisions along the interstate, most of them built the same way: topsoil stripped at grading, subsoil compacted by everything that built the house, and a thin skim of fill spread back over it at the end.
That is close to the worst starting condition turf and planting can get. The soil has to be opened up before anything goes into it, or the lawn stays thin and the beds stay wet no matter what gets planted. Hardscape is actually the easy part on a lot like this; the growing is the work.
Production subdivisions on tight lots, plus older acreage further out.
Every trade is available across the whole service area. These are the ones that tend to carry a Adairsville project:
All ten trades run in-house, so one crew and one schedule covers the whole job.
The featured jobs are documented before and after, from the same camera position. They are the honest version of what a finished project looks like.
Featured jobsA site visit, a real plan, and a price with the quantities shown. No allowances hiding a guess.